Some other data, in particular, my Hyper-V and VMware Virtual Machines are not backed up at all by ATI / ACPHO due to both size and time. My user data / documents etc are on another partition and are backed up in a separate task. That is one backup that remains relatively small. For example, I only keep my Windows OS and installed applications on my C: drive with no significant user data other than perhaps some settings stored in the AppData folders. You would do this by splitting any very large backup tasks into several smaller ones with a subset of selected data. The other option here is to try to size your backups so that they would always be able to complete within the allowed time frame. You might be able to do something if using the Windows Task Scheduler to launch the task but not sure that it would be able to pause the Acronis task while it is active without using a third-party tool. Not using the Acronis Scheduler as far as I know! There's no way to schedule the backup to "pause" at 8AM and "resume" at 6PM, right? So, if I run a backup job, let's say, at 6PM, it'll run 'til completion OR until I pause it at 8AM the next day (assuming no errors).
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |